Question 1
As the altitude increases, the air density decreases, and the heat exchange capability of the air in a unit volume decreases. In this case, NetCol8000-E220 works with derating.
  1. True
  2. False
Correct answer: A
Question 2
When connecting chilled water pipes for the NetCol8000-C, fill water and preserve pressure 8 hours after the conversion adapter is connected.
  1. True
  2. False
Correct answer: B
Question 3
In operant conditioning, the subject is free to make responses at any time, So conditioning is measured by the rate of responding. In most other Ways, however, their forms of learning are essentially the same.
  1. When UPSs are connected in parallel, connect loads to the pL terminal.
  2. When a single UPS works and loads are of the same importance, connect all loads to the sL terminal.
  3. When a single UPS works and loads are divided into two levels, connect the primary load to the sL terminal and the secondary load to the pl_ terminal.
  4. When the UPS is overloaded, the loads connected to the sL terminal will be powered off first to ensure continuous power supply to the loads connected to the pj_ terminal.
Correct answer: D
Question 4
What is the input/output voltage range of the SmartLi BCU?
  1. 280415 V
  2. 300400 V
  3. 300480 V
  4. W00-544 V
Correct answer: C
Question 5
To determine whether the R410A refrigerant meets requirements, compare the internal pressure of the refrigerant with the saturation pressure corresponding to the refrigerant temperature. If the difference between the
internal pressure and the saturation pressure is within the range of which of the following, replace the refrigerant?
  1. 0-0.05 MPa
  2. 0.05-0.1 MPa
  3. 0.1-0.2 MPa
  4. 0.25-0.3 MPa
Correct answer: B
Question 6
Which of the following statements is false about the ECM of the UPS5000-E?
  1. As a control interface for the entire system, the ECM communicates with each module and provides a bus for communication between the dry contact card and the system control card.
  2. The ECM controls the bypass module to work properly, if one ECM is faulty, the UPS can still work in normal mode but cannot be manually switched to bypass mode.
  3. The ECM ensures equalized output currents between modules so that load power is equally shared.
  4. The ECM provides three types of CAN communication: monitoring CAN communication, intra-rack parallel CAN communication, and inter-rack parallel CAN communication.
Correct answer: B
Question 7
The UPS5000-E-200K works in normal mode. If two ECMs are faulty, how does the UPS work?
  1. The UPS has no output.
  2. The UPS transfers to bypass mode.
  3. The LCD is off, but the UPS still works in normal mode.
  4. The UPS switches to battery mode.
Correct answer: B
Question 8
Refer to the exhibit.
  1. 2N deployment crossing rows
  2. 2N deployment without crossing rows
  3. N+1 deployment crossing rows
  4. N+1 deployment without crossing rows
Correct answer: A
Question 9
When installing a water-cooled module, what is the minimum distance between the module and the wall?
  1. 300 mm
  2. 400 mm
  3. 500 mm
  4. 600 mm
Correct answer: D
Question 10
On the ECC800-Pro WebUI, which of the following is the first-level menu of the NMS Application?
  1. System Settings
  2. Maintenance
  3. Home
  4. Monitoring
Correct answer: A
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!